    September 2011

    MAINTENANCE  REPORT
    by Charlie Gioe

    Monthly Report

    Grounds:

    Pools: Test water daily

                Back washed

                Add chemicals as needed

                Collect water samples to be sent out to be tested

                Repair chlorinator

                Replaced filter

                Fixed diving board

                Had Beaver Pool overhead light repaired

    Landscaping: Cut grass, weed whacked, in all amenity areas. Spread wood chip at Beaver Beach

     911 Memorial: removed pine trees and planted trees, seeded and laid hay and cleaned area of debris.  Installed 3 flag poles, install drainage pipe, set up concrete benches, set up and removed chairs. Filled ice cooler and delivered to Admin. Office. Wilmot Nursery came in to plant scrubs.

    Marina: Check docks weekly, C- dock was repaired, walkways were adjusted

    Repaired swim docks

    Hurricane Irene: Cut tree, cleaned up branches, filled in modify in areas that were washed away

    Bulk pick up

    Repaired road sigh

    Fixed soccer nets

    Collected trash inside and out

    Cleaned compactor daily

    Push backfill at Beaver Pool parking lot

    Brought Hot Dog wagon to Deer Beach and returned it to the Barn

     

    Buildings:

    Cleaned building daily (2 new cleaning girls)

    Repair door at Beaver Lodge

    Repaired lights at Kasper Lodge

    Defrosted freezer at MCH

    Repaired fence around A/C at Adult Lodge

    Fixed showerhead at indoor pool bathroom

    Repaired leak in Camp Ground bathroom

    Supplied tables and chair to MCH and return them

     

    Road and Ditch Work:

    Install culvert pipe and ditch; 2 on Mustang, 1 Silver Spring and laid rip rap also laid rip rap on Evergreen

    Filled hot holes

    Repaired left and right sides of Lotus Terrace

    Extended pipe on Huroke

    Swept road by Marina

    Cut down roadside berms and took excess dirt to Beaver parking lot and pushed it back

    Repaired and raked out Deer Beach sand

    Cut roadside grass

     

    Misc:

    Cleaned Maintenance shop

    Changed master cylinder on truck # 4

    Washed Maintenance trucks and Kioti

    Picked up and returned rental chairs

     